"Emmentaler" tunnel
|
| Final steps to finish for the Emmentaler tunnel |
|
|
|
|
|
| In the lower Emmental, this 1.6 kilometre-long tunnel is being built below the River Emme. It is part of the Bahn2000 new construction section that will allow travel from Bern to Zurich. Using automated steering with a
3D-Machine Guidance System of Leica Geosystems, shoulders have now been laid in the biggest “Emmentaler Hole”. |
|
|
|
|
|
|
|
|
|
|
|
|
"Emmentaler" tunnel (PDF, 93.2 KB) |
Download  |
|
|
|
| |
|
|
 |
 |
| |
 |
GOMACO Mainline Slipformer 3D System 3D solution for GOMACO slipform pavers more |
 |
|
|
|
|
|
|
|