Automated 3D control for ballasting works
|
| Channel Tunnel Rail Link (CTRL) |
|
|
|
|
|
| Positioning of track on the Channel
Tunnel Rail Link (CTRL) using automated
3D control |
|
|
|
|
|
|
|
|
|
|
|
|
Automated 3D control for ballasting works (PDF, 171 KB) |
Download  |
|
|
|
| |
|
|
 |
 |
| |
 |
Javelin-s Javelin-s Machine Control Lasers more |
 |
 |
Leica GPS1200 GPS1200 Surveying Systems more |
 |
 |
Leica TPS1200+ The Total Station with the Plus more |
 |
|
|
|
|
|
|
|