Home Leica Geosystems
  Solutions
Products
Support - Service
About us
Contact  
 
Solutions  
 
Cadastral
 
 
Engineering
 
 
 Roads
 
 
 Railways
 
 
 Tunnel surveys
 
 
 Bridges
 
 
 Large Building Construction
 
 
  Al Hamra Tower
 
 
  Construction QA for Lab
 
 
  Surveyors charged with tall order
 
 
  Construction QA Survey
 
 
  Henry Doorly Zoo Upgrade
 
 
  Rugby Sets the Standard
 
 
  Renovation of Gasometers
 
 
  Stadium Australia - Sydney
 
 
  Sydney Opera House
 
 
  Potsdamer Platz - Berlin
 
 
  Relocation of a lighthouse
 
 
  Al-Faisaliah Tower
 
 
  Commerzbank skyscraper
 
 
 Airports and Stadiums
 
 
 Harbours and Docks
 
 
 Water Supplies
 
 
 Plants & Refineries
 
 
Monitoring
 
 
Building & Construction
 
 
Mining & Exploration
 
 
Asset & Facilities Mgmt
 
 
Agriculture
 
 
Aerospace
 
 
Automotive
 
 
General Industry
 
 
Other
 

Large Building Construction

Solutions for Large Building Construction
Large construction projects rely on solutions from Leica Geosystems to complete work efficiently and accurately.
Al Hamra Tower
The Al Hamra tower is expected to feature Kuwait’s tallest building at 412.5 m when it is completed in January 2010. To guarantee that the strong movements of the building do not spoil the contruction works, Leica Geosystems delivers an innovative Core Wall Survey Control System. more
Construction QA for Lab
“HDS and Cyra's software tools provided an easy way to accurately identify differences between actual construction and our design model of this complex, exacting facility. Using these tools, the client successfully avoided significant field-related construction conflicts that would otherwise have led to schedule extensions and additional project costs." Randy Carbone, Senior Supervising Designer, Parsons Corp. more
Surveyors charged with tall order
(Reporter 50, April 2004) Gold Coast surveyors, Treasure and Associates have been charged with a tall order - the surveying and monitoring of the world's soon-to-be tallest residential building - "The Q1 Tower". Currently being constructed in the heart of Surfers Paradise on the Gold Coast of Australia and planned for completion in 2005, the architecturally stunning tower will soar to a massive 80 storeys (323m / 1,058 ft). By March 2004, construction of the complex had reached level 30 and just 46 apartments remain for sale. more
Construction QA Survey
“The sooner you catch dimensional construction errors, the better. The last thing you want to see toward the end of a project is some guy up on the 22nd floor with a welding torch. DEI’s use of Cyrax for construction QA gave us a lot of valuable geometry information, which in turn helped us to reduce risk on the project and meet schedule without any fit-up problems.” Rob Hudson, Senior Superintendent of Construction, Ryan Companies US, Inc more
Henry Doorly Zoo Upgrade
“With Cyrax we quickly obtained details that made our 3D model more accurate and realistic.” V.P. Surveying, Lamp Rynearson & Associates “There is no question in my mind that having animation really made a difference in our fundraising.” Dr. Lee G. Simmons, DMV, Director, Henry Dooly Zoo more
Rugby Sets the Standard
Customers around the world are finding out firsthand how the RUGBY 100 is setting the standard for general construction lasers. more
Renovation of Gasometers
Stephansdom – Prater ferriswheel – Gasometer: these three man-made landmarks of Vienna have, for the past four decades, been prominently visible from afar. The UN City and the Millennium Tower have transported the Danube metropolis' skyline into modern times. The four gigantic Gasometers in the eastern section called Simmering, are being turned into living quarters and commercial centers. more
Stadium Australia - Sydney
Projecting side stands, spiralshaped multi-tier access ramps and the magnificent curved roof structure over the side stands are the distinguishing architectural features of Stadium Australia which visitors notice as they arrive. In this picture building surveyor Neville Thomson is checking the positions of the huge concrete abutments. Their anchorings were determined in 1998 using Leica Geosystems’ measuring technology. more
Sydney Opera House
Millions of people have seen it in books and on postcards; millions more have seen it at first hand during a visit to Australia. Survey engineer Steve Denning also knows it from above and below: a quartercentury after the Opera House was inaugurated, his know-how was needed to assess the effects of weather and sea-water on the structure, and fix the wear and tear. The initial task was to restore the granite promenade surrounds and sea wall of the Opera House. more
Potsdamer Platz - Berlin
The worlds most varied construction site. Potsdamer Platz - Berlin more
Relocation of a lighthouse
It’s not really the application developers had in mind when they introduced the powerful, speedy and accurate Leica one-man robotic survey system – nor did they envision that one man might have reason to operate two at the same time. But that’s exactly what happened during three surprising weeks this summer on the North Carolina shores during the historic Cape Hatteras Lighthouse relocation. more
Al-Faisaliah Tower
What is recognized today as the highest building of Saudi Arabia started in April 1997. more
Commerzbank skyscraper
With its 300 metre height, the distinctive feature of the new Commerzbank high-rise office block in Frankfurt, which towers over all other buildings in this world famous banking city, is not just its imposing height. The London firm of architects, Sir Norman Foster and Partner, chose for the giant building, a triangular form, each side of which has a length of 60 metres. more