Home Leica Geosystems
  Solutions
Products
Support - Service
About us
Contact  
 
Solutions  
 
Cadastral
 
 
Engineering
 
 
Monitoring
 
 
 Natural Phenomenons
 
 
 Man-Made Structures
 
 
  Burj Dubai
 
 
  Al Hamra Tower
 
 
  Hong Kong Airport Express Line
 
 
  Jiangyin Bridge, China
 
 
  Northern Italian Reservoir
 
 
  GPS along the Danube
 
 
  Sydney Opera House
 
 
  Tsing Ma bridge - Hong Kong
 
 
  Yang-Pu bridge - Shanghai
 
 
  Akashi Strait suspension
 
 
  Vereina Tunnel - Switzerland
 
 
  Hornberg Reservoir
 
 
  Deformation monitoring
 
 
Building & Construction
 
 
Mining & Exploration
 
 
Asset & Facilities Mgmt
 
 
Agriculture
 
 
Aerospace
 
 
Automotive
 
 
General Industry
 
 
Other
 

Man-Made Structures

Solutions for Monitoring - Man-Made Structures
Leica Geosystems' surveying solutions are used worldwide for the monitoring of man-made structures such as bridges, dams and buildings, during construction as well as after.
Burj Dubai
"The system has proven to be fantastic! We have used our Leica GX1200, TPS1201 and Nivel 220 systems all the way!" Reaching top of concrete for the Burj tower at Level 156, at level 585.7 m, Chief Surveyor Douglas Hayes was impressed... more
Al Hamra Tower
The Al Hamra tower is expected to feature Kuwait’s tallest building at 412.5 m when it is completed in January 2010. To guarantee that the strong movements of the building do not spoil the contruction works, Leica Geosystems delivers an innovative Core Wall Survey Control System. more
Hong Kong Airport Express Line
The Kowloon Southern Link (KSL) will be a 3.8 km connection between the East and West Rail in Hong Kong. The construction of the $8.3 billion KSL is scheduled for completion in 2009. The Kowloon-Canton Railway Corporation (KCRC) in Hong Kong acquired an Automation Deformation Monitoring System from Leica Geosystems in December 2005 for continuously monitoring settlement and overall deformation of a section of existing Airport Express Railway. more
Jiangyin Bridge, China
The Jiangyin Yangtze River Highway Bridge is the first super-large steel box-girder suspension bridge that spans more than one kilometer in China. It is the longest steel boxgirder suspension bridge in China, the fourth longest in the whole World. It services a superhighway which is the national key trunk route crossing the Yangtze River. The Jiangyin Yangtze River Highway Bridge is the second suspension bridge that was constructed over the Yangtze River. It lies between Jiangyin and Jingjiang of Jiangsu Province, at the lower reaches of Yangtze River.  more
Northern Italian Reservoir
Many of the hydroelectric reservoirs located in the Alps of Northern Italy are built in narrow valleys which are orientated North-West / South-East. Due to the valley's orientation, only one side is exposed to the sun and is subject to significant temperature differences within short periods of time. In many cases this situation has caused a different geological structure in the two sides of the valley. In one of the valleys a double-sweep arc-gravity dam was constructed in the years 1950-1960. more
GPS along the Danube
Could the turbines in a new hydro-electricity generating station cause ships to drift within their shipping lanes? Following the construction of a new hydro-electricity generating station on the bend in the River Danube at the lower Bavarian town of Bad Abbach (Germany), it was feared that the operating turbines might have just such an effect. more
Sydney Opera House
Millions of people have seen it in books and on postcards; millions more have seen it at first hand during a visit to Australia. Survey engineer Steve Denning also knows it from above and below: a quartercentury after the Opera House was inaugurated, his know-how was needed to assess the effects of weather and sea-water on the structure, and fix the wear and tear. The initial task was to restore the granite promenade surrounds and sea wall of the Opera House. more
Tsing Ma bridge - Hong Kong
Record-breaking Tsing Ma Bridge. more
Yang-Pu bridge - Shanghai
With a span of 620m, Yang-Pu bridge is not only one of the longest suspension bridges in the world, but also one of the busiest. Stability and reliability of such a bridge is very important, and regular checks are necessary to provide the highest security. Surveying technology has evolved during the last few years to introduce new systems to improve the accuracy of measurements and greatly reduce the time needed to perform such tasks. By using automated Leica total stations, able to find the targets automatically, combined with deformation measurement software, results can be viewed directly on site. more
Akashi Strait suspension
A network of precise GPS reference stations, supplied by Leica Geosystems, has been installed on the world’s longest suspension bridge in Japan to monitor movements of the bridge’s structure in real-time, with millimetre-level accuracy. more
Vereina Tunnel - Switzerland
Geodetic surveys of Vereina Tunnel - Switzerland  more
Hornberg Reservoir
The dams and water reservoirs in the German province of Baden-Württemberg are resurveyed every five years as part of an ongoing monitoring programme. One of the sites being checked is the Hornberg reservoir, located in the southern Black Forest on a mountain peak 1050 m above sea level. The reservoir feeds the Wehr hydroelectric power station, 630 metres further down and operated by Schluchseewerk AG. A study by the Geodetic Institute of the University of Karlsruhe set out to determine whether GPS measurements using Leica Geosystems’ new System 500 might be an economical and sufficiently accurate alternative to conventional terrestrial methods. more
Deformation monitoring
When a new bridge is being built adjacent to an existing one, there are a number of safety concerns. In particular the deformation and stress factor imposed on the existing bridge during construction. more