Hong Kong Airport Express Line
|
| Automation Deformation Monitoring |
|
|
|
|
|
| The Kowloon Southern Link (KSL) will be a 3.8 km connection between the East and West Rail in Hong Kong. The construction of the $8.3 billion KSL is scheduled for completion in 2009. The Kowloon-Canton Railway Corporation (KCRC) in Hong Kong acquired an Automation Deformation Monitoring System from Leica Geosystems in December 2005 for continuously monitoring settlement and overall deformation of a section of existing Airport Express Railway. |
|
|
|
|
|
|
|
|
|
|
|
|
Leica Geosystems TruStory: Monitoring System for Hong Kong Airport Express Line |
Download  |
|
|
|
| |
|
|
 |
 |
| |
 |
System 2000 TCA1800 / TCA2003 / TC2003 Total Stations more |
 |
 |
Leica GeoMoS The Leica Automatic Deformation Monitoring System more |
 |
|
|
|
|
|
|
|